GEO-DRILL LIMITED

Best viewed on a device with a bigger screen...
Tel: 01207 509 727

Porthmadog

Porthmadog

A sequence of open holes were drilled, with Standard Penetration Testing (SPT) conducted every 3 meters until reaching rock head

A sequence of open holes were drilled, with Standard Penetration Testing (SPT) conducted every 3 meters until reaching rock head. Upon encountering rock, drilling continued using the Geobore S coring method to ascertain the presence of competent rock, with a minimum of 3 meters required. Upon reaching the target depth, 50mm standpipes and piezometers were installed for gas and water monitoring purposes.

Ready to discuss your project?

Contact Us  

Free Consultation

Send your details using this form and one of our specialists will give you a call to discuss your project...

Free Consultation

Data Processing Confirmation:

Access Key Enabled Navigation
Keywords for: GeoDrill :: Porthmadog

Safe system of work, gas and water monitoring, Training scheme nvq, Ground source heating, Ground loop installation, Thermally enhanced grout, Geothermal Supply Chain, Certificate of conformity, Traffic management plan, Safe work zone, Service and support, stanard penetration testing, Geobore S coring, Site Investigation, Renewable energy, Carbon Footprint, Borehole protection, Safety system, Service support, Delivery control, Quality control, Logistics planning, Fenced area, Green Energy, Hole depth, Drilling rigs, Pressure testing, Well maintained, Geobore S, Core size, Soil sampling, open holes, GeoDrill, Geothermal, Drilling, Design, Qualified, Environmental, Investment, Inovative, Mobilisation, Technical, Infrastructure, Efficiency, Grouting, Inspections, porthmadog, drilled, spt, standpipes, piezometers