GEO-DRILL LIMITED

Best viewed on a device with a bigger screen...
Tel: 01207 509 727

Contact GeoDrill

Contact GeoDrill

We're waiting to discuss your geothermal project

  GeoDrill

Hounsgill Park Estate, County Durham DH8 7NU

Tel: +44 (0) 1207 509 727

Email: enquiries@geodrill-ltd.co.uk

Some frequently asked questions  

How deep is a Geothermal borehole?
The depth of the borehole is typically 150-200m deep but this is determined during the preliminary design study and any subsequent test hole drilling.
What is the maximum depth you can go to?
We are currently drilling geothermal boreholes at depths of up to 400m.
What diameter will the hole be?
The hole is drilled typically at approx 5” diameter.
How long does it take to drill a hole?
1-2 days per borehole depending on geological conditions found, the depth, the site conditions and water supply available.
What is the size of the drilling rig?
The drilling rigs range from 9 - 12 tonnes with a footprint of approx. 7.5m x 2.5m
How much space does the drilling operation take up?
The operating footprint of the rig is approx 12m x 2.5m but a separate agreed area will be required for the mud recycling unit, mud pump other additional equipment to suit the specific site.
Will there be any mess during the works/How much mess will it make?
Mess will be kept to a minimum by using a modern mud recycling unit within a controlled sealed system.
Does the drilling operation cause a lot of noise?
Noise occurs during drilling operations but we can use control measures to limit its nuisance on a site by site basis.
How much does a geothermal well cost?
Each borehole is different and therefore there is no set price for a borehole or boreholes. Upon request however, we will be able to provide you with a quote for your requirements which will depend on various factors including number and depth of boreholes, site location, geology and water supply.

Free Consultation

Send your details using this form and one of our specialists will give you a call to discuss your project...

Free Consultation

Data Processing Confirmation:

Access Key Enabled Navigation
Keywords for: GeoDrill :: Contact Us

drilling geothermal boreholes at depths of up to 400m, drilling rigs range from 9 - 12 tonnes, Safe system of work, 1-2 days per borehole, Training scheme nvq, Ground source heating, Ground loop installation, Thermally enhanced grout, Geothermal Supply Chain, Certificate of conformity, Traffic management plan, Safe work zone, Service and support, Hounsgill Park Estate, Site Investigation, Renewable energy, Carbon Footprint, Borehole protection, Safety system, Service support, Delivery control, Quality control, Logistics planning, Fenced area, Green Energy, Hole depth, Drilling rigs, Pressure testing, Well maintained, Geobore S, Core size, Soil sampling, geothermal borehole, GeoDrill, Geothermal, Drilling, Design, Qualified, Environmental, Investment, Inovative, Mobilisation, Technical, Infrastructure, Efficiency, Grouting, Inspections, durham, borehole